Új támogatási lehetőség a vállalati energiatárolók és termelő rendszerek telepítésére

New grant opportunity will be launched soon under the Jedlik Ányos Energy Scheme, supporting the storage and the production of renewable energy, in which both SMEs and large enterprises can apply for the non-refundable grant.

Below, we have summarized the key information regarding the grant:
  1. Form of grant: Non-refundable cash subsidy
  2. Grant amount:
  • Minimum HUF 10 million – maximum HUF 1 billion
  • Total available budget: HUF 50 billion, from which it is expected that 2,500–2,600 projects will receive subsidy.
    • For large enterprises: HUF 25 billion
    • For micro, small and medium-sized enterprises (SMEs): HUF 25 billion
  1. Grant ratio:
    • In case of large companies: 30%
    • In case of medium enterprises: 40%
    • In case of micro-, and small enterprises: 50%
  2. Scope of eligible beneficiaries:
    • Have at least 1 closed financial year.
  3. Eligible activities:
    • Procurement of energy storage units/facilities (electric or thermal energy) (mandatory component)
    • Installation of renewable electricity and/or heat producing systems for own use (optional component)
    • Acquisition of related intangible assets (optional component)
    • Preparation of technical feasibility studies (optional component)
    • Preparation of necessary documentation and obtaining certificates for construction (optional component)
  1. Final project completion deadline: 
    1. 31/12/2027
  2. Application period: 
    1. Expected from August 2025
Should you need further information about the call or would like to consult with our experts, do not hesitate to reach out us at fdi@bdo.hu. Our team is committed to provide the highest-level support throughout every stage of our clients’ projects, ensuring the highest chances of success.